Decide it before it is framed.

We read the drawing set, come back with the conflicts, and count the loads nobody put on the plans yet — the pool, the casita, the second EV, the solar that shows up three years later. Then we mark it on site and walk it with you.

The cheapest time to change anything.

  • Plans are drawn but the electrical layout has never been walked with the owner.

  • The service size was assumed rather than calculated.

  • Solar, EV charging, or a pool is likely later but not on the drawings.

  • Multiple trades need the same wall and nobody has arbitrated it yet.

The scope, line by line.

01
Plan and specification review

Drawings read against how the space will actually be used, with conflicts and omissions flagged in writing before bid.

02
Fixture and device coordination

Cut sheets, dimming compatibility, and mounting conditions confirmed against the reflected ceiling plan.

03
Load and equipment planning

Service size, panel locations, and feeder routes decided early, with EV, HVAC, pool, and solar loads counted from the start.

04
Builder and designer collaboration

We sit in the coordination meetings so electrical answers arrive on the schedule the rest of the trades are working to.

05
Pre-construction walkthroughs

A framed-stage walk with the owner to confirm every switch, outlet, and fixture location while changes are still free.

06
Future-ready infrastructure planning

Spare conduit, panel space, and pathways left for the additions that show up two years after move-in.

Four steps, every time.

The scope changes from job to job. The sequence does not, so you always know what happens next and what it depends on.

  1. Read the plans

    We review the drawing set and specifications and come back with questions, conflicts, and options.

  2. Interview the owner

    How each room gets used, where devices live, and what gets added later all shape the layout.

  3. Mark it on site

    Locations are marked on the studs and walked with you, so decisions are made in the space rather than on paper.

  4. Hand off a buildable plan

    The result is a coordinated scope the crew can install and the inspector can follow without interpretation.

Every decision after the pre-drywall walk costs money to change.
Plan Your Project
Electricians coordinating a new construction project from marked-up plans
Design · Coachella Valley

Questions about design & planning.

What does electrical design planning include?

It can include plan review, loads, equipment, panels, fixture and device locations, switching, controls, routing, trade coordination, and infrastructure for future needs.

Who does V12 Electric coordinate with?

V12 Electric can coordinate electrical decisions with homeowners, builders, designers, architects, equipment vendors, and other trades involved in the project.

Why plan electrical work before construction begins?

Early planning exposes capacity, access, routing, equipment, and sequencing issues while they are still easier to solve and before finished work has to change.

Can V12 Electric review plans drawn by someone else?

Yes. Plans from an architect, designer, or another contractor can be reviewed, with conflicts, omissions, and capacity concerns returned in writing.

When in the schedule should planning happen?

Before framing where possible, and no later than the pre-drywall walkthrough. Every decision made after that point costs more to change.